Apple Xserve G5 User Manual Page 28

  • Download
  • Add to my manuals
  • Print
  • Page
    / 96
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 27
28 Chapter 3 Installing Your Server in a Rack
Preparing the Server for Installation
If possible, work with another person as you prepare and install the server in a rack.
Follow these steps to prepare the server hardware for installation.
1 Unpack the server from its box and place it on the table.
Follow the instructions in the booklet Xserve G5 Quick Start to unpack the server.
2 At the back of the server, write down the serial number from the servers back panel.
You will need the servers serial number to log in when you first set up the server
software.
3 Remove the protective faceplate from the servers front panel by unscrewing the
thumbscrews at each side of the faceplate and lifting it off.
Set the thumbscrews aside.
4 Remove any clear plastic covering the front or top of the system.
5 Do not remove the small plastic protector in the optical drive slot. Leave this protector
in place until the system is secured in the rack.
Protective faceplateRemove the two shipping screws.
There is one screw on either
side of the server.
Remove the four thumbscrews that hold the protective faceplate
in place, and remove the faceplate by lifting it straight up.
Plastic optical drive protector
Page view 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 95 96

Comments to this Manuals

No comments