Apple Processor Cage and Clips Installation Guide Page 21

  • Download
  • Add to my manuals
  • Print
  • Page
    / 117
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 20
Required Tools
The following tools are required for installation:
Phillips screwdriver
Torx screwdriver
Additional requirements
If your facility or configuration requires an L5–20R plug, you must obtain a third-party L5–20R to
NEMA 5–20P adapter before installing or connecting the H5M54A 1.9kVA 120V Basic PDU.
Recommended Hardware Configurations
Configurations
The PDU is installed in a rack in the following configurations:
A single PDU configuration, with the outlets facing the center of the rack
A single PDU configuration, with the outlets facing the rear of the rack
Recommended Hardware Configurations 21
Page view 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 116 117

Comments to this Manuals

No comments